What internet speed is required to transfer 5 GB in 4 hours?
Moving 5 GB within 4 hours requires a theoretical throughput of 2.78 Mbps. Accounting for a 90% planning assumption, the recommended planning speed target is 3.09 Mbps.
90% is a planning assumption accounting for transport and protocol overhead—not a measured or guaranteed ISP speed.
Required Speed Across Nearby Deadlines
| Target deadline | Theoretical | Planning | Planning effective rate |
|---|---|---|---|
| 15 minutes | 44.4 Mbps | 49.4 Mbps | 5.56 MB/s / 44.4 Mbps |
| 30 minutes | 22.2 Mbps | 24.7 Mbps | 2.78 MB/s / 22.2 Mbps |
| 1 hour | 11.1 Mbps | 12.3 Mbps | 1.39 MB/s / 11.1 Mbps |
| 2 hours | 5.56 Mbps | 6.17 Mbps | 0.69 MB/s / 5.56 Mbps |
| 4 hoursCurrent selection | 2.78 Mbps | 3.09 Mbps | 0.35 MB/s / 2.78 Mbps |
| 6 hours | 1.85 Mbps | 2.06 Mbps | 0.23 MB/s / 1.85 Mbps |
| 8 hours | 1.39 Mbps | 1.54 Mbps | 0.17 MB/s / 1.39 Mbps |
| 12 hours | 0.93 Mbps | 1.03 Mbps | 0.12 MB/s / 0.93 Mbps |
Bandwidth Headroom & Deadline Alternatives
| Transfer profile | Theoretical | Planning | Planning effective rate |
|---|---|---|---|
| Reference calculation | 11.1 Mbps | 12.3 Mbps | 1.39 MB/s / 11.1 Mbps |
| Reference calculation | 5.56 Mbps | 6.17 Mbps | 0.69 MB/s / 5.56 Mbps |
| Reference calculation | 1.85 Mbps | 2.06 Mbps | 0.23 MB/s / 1.85 Mbps |
| Reference calculation | 1.39 Mbps | 1.54 Mbps | 0.17 MB/s / 1.39 Mbps |
100% available bandwidth Calculated scenario | 2.78 Mbps | 3.09 Mbps | 0.35 MB/s / 2.78 Mbps |
75% available bandwidth Calculated scenario | 3.7 Mbps | 4.12 Mbps | 0.35 MB/s / 2.78 Mbps |
50% available bandwidth Calculated scenario | 5.56 Mbps | 6.17 Mbps | 0.35 MB/s / 2.78 Mbps |
Time-Bounded & Deadline-Sensitive Bandwidth Sizing
When This Calculation Applies: This estimate helps determine the minimum connection speed needed to complete a data transfer before a fixed cutoff window.
How This Is Calculated
Calculations convert SI decimal file sizes to bits using 8 bits = 1 byte (1 MB = 1,000,000 bytes; 1 Mbps = 1,000,000 bps). The theoretical result reflects 100% nominal link saturation, while the planning estimate applies a 90% planning assumption for transport overhead.
Try Your Own Values
90% is a planning assumption accounting for transport and protocol overhead—not a measured or guaranteed ISP speed.
Open interactive calculator to adjust size, speed, or efficiency